Tag Archives: crack gauge

321-325 W 35th Street, New York, NY

Project Spotlight: 321-325 W 35th Street, New York, NY

LIST OF SERVICES:

– Crack Gauge/Telltales Installation and Monitoring
– Real Time Vibration Monitoring (seismographs)

Saltus was hired for services related to foundation work for a commercial project located at 321-325 West 35th street, between 8th and 9th Ave in the Hell’s Kitchen section of Midtown Manhattan, south of Times Square. Their services were conducted over a 16-month period. Services included crack gauge/telltale monitoring, installation of seismographs and real time vibration monitoring for the duration of the project.

51 Jay Street, Brooklyn, NY

Featured Project: 51 Jay St, Brooklyn, NY

Project type: Major Renovation, Demolition, Addition 

Services: Pre-construction survey, Existing Conditions Photographic Documentation, Seismic Monitoring, Vibration Monitoring, Crack Gauge Monitoring, Subway Tunnel Monitoring

Our client hired us to provide services at their construction project located at 51 Jay Street in the DUMBO historic district in Brooklyn, NY. The property is a landmark building and was remodeled by the client. The building now houses condominiums.

Saltus LLC performed a pre-construction survey on an adjacent building located on Water Street prior to the start of the project. We also performed vibration monitoring at the site to preserve the historic facade façade of the building.

The project included additional services related to the east (Manhattan bound) subway tunnel adjacent to the construction site.

Services were conducted for the duration of the 15-month long project.

Some details of the work include the following:

  • Wireless vibration monitoring was completed on the façade of the building from the top floor to the basement during the demolition and construction phases. Included real time monitoring and notification services.
  • A crack gauge monitor was placed on the façade of the building, on the northwest corner of the site.
  • Our work in the subway tunnel included both photographic surveying as well as vibration monitoring for the Manhattan-bound subway tunnel running under the East River. For this project, our team installed seismic monitoring equipment in the tunnels located 10 flights below ground.
  • Our services included manned monitoring with on-site technicians.